Pormpuraaw Reservoir Tender Design

Due to a high water demand and the hydraulic limitations of the water supply infrastructure to meet increasing demand, a 2ML reservoir inclusive of gas chlorine dosing system at the WTP site was designed to a preliminary design stage and tender specification, ready for procurement.

In addition to the preliminary design of the concrete reservoir, scope definition, site plans and specifications; GANDEN provided:

  • SCADA upgrades,
  • Gas chlorine dosing system,
  • Site earthworks/landscaping, and
  • Galvanised steel framed roofing.

GANDEN's Role

  • Technical Review and Design

Year Completed

2016