Gold Coast Water Recycled Water Mains Replacement

Design of a replacement of a Y junction. This project required high dimensional accuracy as the shutdown window was short. This was achieved using laser scanning of the existing pipe, then scanning of the constructed pipe in the workshop. This scanned data was then input into the model to check the manufacture of the pipe before dispatch to site. The construction was performed without any site modification.

GANDEN's Role

  • Civil Design
  • Mechanical Design
  • Building Design
  • Hydraulic Modelling
  • Functional Description
  • HAZOP

Year Completed

2019