Beechwood Water Supply Pipeline Design

Civil design and documentation of a new water main approximately 6km in length from the existing Rosewood reservoir to Beechwood village. The main included approximately 410m of DN600 DICL and approximately 5400m of DN200 (various materials), including an under bore of the Hastings River.

Check out more projects: