GANDEN was engaged to design the Herberton Water Treatment Plant in North Queensland. The scope included balance of plant design and equipment integration for a 1.75 ML/d WTP consisting of multimedia filtration, UV and 2 ML reservoir. The works included: Hydraulic sizing and design of the WTP, Pump sizing and selection, Piping design, Development of the monitoring and control philosophy, Chlorine disinfection